Image coming soon

Epoxicote Core Rapid

$146.06
SKU:
403464
Selected Color is
Black
Navy Gray
Safety Blue
Safety Green
Safety Orange
Safety Red
Safety Yellow
Silver Gray
White
Adding to cart… The item has been added
Epoxicote Core Rapid is a two-component, high solids epoxy floor coating designed for projects when faster recoat time is critical. It delivers a durable, abrasion-resistant, and chemical-resistant finish while significantly reducing downtime. Ideal …

Product Detail

Epoxicote Core Rapid is a two-component, high solids epoxy floor coating designed for projects when faster recoat time is critical. It delivers a durable, abrasion-resistant, and chemical-resistant finish while significantly reducing downtime. Ideal for facilities that need efficient project turnaround, this rapid-curing epoxy coating provides long-lasting protection without sacrificing performance.

Applications

  • Factory floors
  • Break rooms
  • Aisle ways
  • High-traffic work areas
  • Industrial and commercial facilities

Key Features

  • 2-part high solids epoxy formula
  • Semi-gloss finish for a durable surface
  • Extremely versatile, easy to use and durable
  • Ultra-smooth finish with high build capability
  • Excellent resistance to solvents, chemicals, abrasion, and impact
  • Recoat in 4–6 hours and vehicle traffic in 72 hours

Explore Other Epoxicote Systems

  • Need more working time? Consider Epoxicote Core Standard
  • Need added traction? Choose Epoxicote Core Anti-Slip
  • Looking for enhanced performance? Upgrade to Epoxicote Pro
  • Need maximum durability? Explore Epoxicote Ultra

Specifications

Usage Interior/Exterior: Interior
Finish: High gloss, smooth
Suitable for: Concrete floors, masonry, steel, galvanized metal
Primer Required?: Yes. Powerfloat Primer on bare concrete. Scuff sand previously coated concrete.
Recommended Number of Coats: Typically one is sufficient. Two may be necessary for high traffic areas.
Pot Life: 2 hours depending on temperature
Curing Time: At 70°F, 8-12 hours for foot traffic and 72 hours for heavy traffic. Recoat after 4-6 hours.
Coverage: Approximately 180-200 square feet when applied by roller.
Induction Time: 15 minutes

How to Apply

Surface Preparation: Concrete and Masonry
Concrete to be treated must be dry, at least four weeks old and free of any soft surface laitance, or contamination All loose material should be removed. Very smooth bare concrete or concrete with soft surface laitance should be mechanically ground or etched with Watco Cemtetch and the area thoroughly hosed off and allowed to dry. Grease or oil should be removed with Rust-Oleum Cleaner Degreaser and the area thoroughly hosed off and allowed to dry.

Surface Preparation: Steel and Metal
Remove oil, dirt, grease, and other chemical deposits with Rust-Oleum Professional Cleaner Degreaser or other suitable cleaner. Remove loose rust, white rust or deteriorated old coatings by hand or power tool cleaning or brush off blasting. Rinse thoroughly with fresh water and allow to fully dry.

Mixing
Both the base and activator components are highly pigmented. Mix each component thoroughly to ensure any settled pigment is re-dispersed before combining the components together. Combine at a 1:1 ratio by volume in a container large enough to hold the total volume. Mix thoroughly for 2-3 minutes. Power mixing is preferred. Do not mix more material than you plan to use within the listed pot life. You MUST allow for a 15 minute induction period before application.

Application
Best results are obtained in warm conditions (minimum 60°F). On horizontal surfaces apply by medium pile type roller (not foam) in one coat. Apply product in an east and west direction and then finish in north and south direction.

Epoxicote Core Rapid is a two-component, high solids epoxy floor coating designed for projects when faster recoat time is critical. It delivers a durable, abrasion-resistant, and chemical-resistant finish while significantly reducing downtime. Ideal for facilities that need efficient project turnaround, this rapid-curing epoxy coating provides long-lasting protection without sacrificing performance.

Applications

  • Factory floors
  • Break rooms
  • Aisle ways
  • High-traffic work areas
  • Industrial and commercial facilities

Key Features

  • 2-part high solids epoxy formula
  • Semi-gloss finish for a durable surface
  • Extremely versatile, easy to use and durable
  • Ultra-smooth finish with high build capability
  • Excellent resistance to solvents, chemicals, abrasion, and impact
  • Recoat in 4–6 hours and vehicle traffic in 72 hours

Explore Other Epoxicote Systems

  • Need more working time? Consider Epoxicote Core Standard
  • Need added traction? Choose Epoxicote Core Anti-Slip
  • Looking for enhanced performance? Upgrade to Epoxicote Pro
  • Need maximum durability? Explore Epoxicote Ultra
Usage Interior/Exterior: Interior
Finish: High gloss, smooth
Suitable for: Concrete floors, masonry, steel, galvanized metal
Primer Required?: Yes. Powerfloat Primer on bare concrete. Scuff sand previously coated concrete.
Recommended Number of Coats: Typically one is sufficient. Two may be necessary for high traffic areas.
Pot Life: 2 hours depending on temperature
Curing Time: At 70°F, 8-12 hours for foot traffic and 72 hours for heavy traffic. Recoat after 4-6 hours.
Coverage: Approximately 180-200 square feet when applied by roller.
Induction Time: 15 minutes

Surface Preparation: Concrete and Masonry
Concrete to be treated must be dry, at least four weeks old and free of any soft surface laitance, or contamination All loose material should be removed. Very smooth bare concrete or concrete with soft surface laitance should be mechanically ground or etched with Watco Cemtetch and the area thoroughly hosed off and allowed to dry. Grease or oil should be removed with Rust-Oleum Cleaner Degreaser and the area thoroughly hosed off and allowed to dry.

Surface Preparation: Steel and Metal
Remove oil, dirt, grease, and other chemical deposits with Rust-Oleum Professional Cleaner Degreaser or other suitable cleaner. Remove loose rust, white rust or deteriorated old coatings by hand or power tool cleaning or brush off blasting. Rinse thoroughly with fresh water and allow to fully dry.

Mixing
Both the base and activator components are highly pigmented. Mix each component thoroughly to ensure any settled pigment is re-dispersed before combining the components together. Combine at a 1:1 ratio by volume in a container large enough to hold the total volume. Mix thoroughly for 2-3 minutes. Power mixing is preferred. Do not mix more material than you plan to use within the listed pot life. You MUST allow for a 15 minute induction period before application.

Application
Best results are obtained in warm conditions (minimum 60°F). On horizontal surfaces apply by medium pile type roller (not foam) in one coat. Apply product in an east and west direction and then finish in north and south direction.